Manufacturing
Six-plant network consolidation
Replaced six independently-built site networks with one standardised design, central firewall policy and site-to-site VPN.
Client: Meridian Foods
- -71%
- Network tickets
- 6 wks
- Cutover
- 6
- Sites standardised
- Zero
- Production stoppages
Each plant had been wired by whichever local contractor was available at the time.
What we changed
One switching standard, one addressing plan, one firewall policy pushed from the centre.